Various Job Vacancies in Project ERSAI, KAzakhstan based :
I. Piping / Structural Supervisor
Mission:
- Organises and controls the correct performance of the construction and assembly work, assisting the Mechanical Superintendent in the management for correct performance of the mechanical works ensuring full compliance with safety and quality standards and procedures.
Tasks:
- Carries out the work in the planned times and costs
- Applies the final, procedures approved by the client
- Ensures observance of the project specifications
- Ensures that safety and quality standards are respected
- Prepares and co-ordinates the detailed programmes for the correct management of the works of one’s specific responsibility
- Supports the Superintendent in solving technical and management problems encountered in the area of responsibility
- Manages the technical and administrative documentation of expendable and assembly material
- Manages direct and sub-contracted work
- Manages human and technical resources, indicating any needs and surplus in good time
- Ensures that production quality and quantity standards are observed
- Ensures that safety standards are observed and guarantee the quality of the work
- Assists with the hand-over of completed works
- Measures the works carried out with the Works Director and sub-contractors representatives
- Supplies the elements needed to draw up the accounts
- Assists with the demob of the site (shipment of material and equipment, solution of any outstanding questions).
Job Detail :
- Project : ERSAI
- Position : Piping / Structural Supervisor (SINGLE STATUS)
- Contract type : 12 months International contract renewable
- Work Location : Kuryk Base, Kazakhstan
- Start : ASAP
- Rotation : 90/21 (90 days of work followed 21 days of paid vacation)
- Working days/hours : 208 hours per month. 6 days / 8 hours per day
- Salary : 1′500.00 Monthly (USD)
- OVT : 10.80
- Accommodation : (Camp) Free accommodation + full boarding provided
- Insurance D&D : 100′000 USD
- Life Insurance : 30′000 USD
- Travel : Prepaid ticket at beginning, end of project and for each work leave rotation cycle
- Pre employment Expenses : On company account
II. Mechanical Engineer
Job Detail :
- Project : ERSAI
- Position : Mechanical Engineer (SINGLE STATUS)
- Contract type : 12 months International contract renewable
- Work Location : Kuryk Base, Kazakhstan
- Start : ASAP
- Rotation : 90/21 (90 days of work followed 21 days of paid vacation)
- Working days/hours : 208 hours per month. 6 days / 8 hours per day
- Salary : 3′000.00 Monthly (USD)
- OVT : 21.60
- Accommodation : (Camp) Free accommodation + full boarding provided
- Insurance D&D : 100′000 USD
- Life Insurance : 30′000 USD
- Travel : Prepaid ticket at beginning, end of project and for each work leave rotation cycle
- Pre employment Expenses : On company account
III. Onshore Project Engineer
Job Detail :
- Project : ERSAI
- Position : Project Engineer SINGLE STATUS
- Contract type : 12 months renewable international contract with Secondment
- Work Location : Atyrau Office, Kazakhstan
- Start : ASAP
- Rotation : 120/16
- Working days/hours : 6 days / 8 hours per day
- Salary : 3′000.00 USD
- Over time rate : 21.60
- Accomodation : Apartment per company standard + 220′000 KZT (1′800 USD equivalent) monthly living allowance paid when present on site
- Insurance D&D : 100′000 USD
- Medical Coverage : Provided
- Travel : Economy prepaid ticket at beginning, end of project and for each work leave rotation cycle
- Pre employment Expenses : On company account
- Cost Center : 086971
IV. Method Statement Engineer
Job Detail :
- Project : ERSAI
- Position : Method Statement Engineer (SINGLE STATUS)
- Contract type : 12 months International contract renewable
- Work Location : Kuryk Base, Kazakhstan
- Start : ASAP
- Rotation : 90/21 (90 days of work followed 21 days of paid vacation)
- Working days/hours : 208 hours per month. 6 days / 8 hours per day
- Salary : TBA
- OVT : TBA
- Accommodation : (Camp) Free accommodation + full boarding provided
- Insurance D&D : 100′000 USD
- Life Insurance : 30′000 USD
- Travel : Prepaid ticket at beginning, end of project and for each work leave rotation cycle
- Pre employment Expenses : On company account
V. NDT Coordinator Level III
Job Detail :
- Project : ERSAI
- Position : NDT Coordinator Level III (SINGLE STATUS)
- Contract type : 12 months International contract renewable
- Work Location : Kuryk Base, Kazakhstan
- Start : ASAP
- Rotation : 90/21 (90 days of work followed 21 days of paid vacation)
- Working days/hours : 208 hours per month. 6 days / 8 hours per day
- Salary : 3′500 USD
- OVT : 25.25
- Accommodation : (Camp) Free accommodation + full boarding provided
- Insurance D&D : 100′000 USD
- Life Insurance : 30′000 USD
- Travel : Prepaid ticket at beginning, end of project and for each work leave rotation cycle
- Pre employment Expenses : On company account
Additional information:
For all positions based in Kazakhstan, each candidate must possess a bachelor’s degree to be considered.
In addition, white collar jobs in Kazakhstan require a bachelor’s degree to be considered. In addition, Company must receive employee certificates as part of the new Kazakhstan immigration office requirement for all international employees entering the country applying for a work permit. They will need to submit work certificates as described below:
1. Employment certificates (new requirements from the labor office)
a) Employees having Bachelors Degree must submit the certificates for the latest 5 years of work experience
b) Employees doesn’t have the Bachelor’s Degree must submit the certificates at least 7 years of work experience
All Candidates must have good level of English proficiency skills in writing and speaking.
All candidates must have their diplomas authenticated by their universities then legalized by the Kazakhstan embassy (if there is no Kazakhstan embassy in your country, one can send applicants’ diplomas for legalization during the mobilization period).
Interested Candidate, please submit the following documents:
* Updated CV
* Trade/Vocational certificate, Diploma or Bachelor
* Employment certificates (Employees with Bachelor for the latest 5 years of experience. Employees without Bachelor for the latest 7 years of experience).
To: info [ at ] goto [ dot ] co [ dot ] id using only MS Word or PDF not more than 750 kb and mentioning your position applied & location (Milan – Kazakhstan) on top of your CV’s.
We apologized not to consider any Candidates having experiences less than 5 years.
Related Post
- Lowongan Kerja Qatar – Petrol Mechanic, Heavy Equiptment & Hydraulic Mechanic, Diesel Mechanic, Auto Denter, Spray Painter, Electrician, Machanist via PT. Buana Safira Abadi (December 7th, 2009)
- IT Job Vacancy Singapore – .NET Developer via Dicetek Pte Ltd. (August 2nd, 2009)
- Job Vacancy STM SMP S1 – Saudi Arabia – Project Engineer, Installation Technician, Molding Technician via PT. Buana Safira Abadi (July 10th, 2009)
- Lowongan Kerja SMP – Malaysia – Operator Produksi via PT. Yanbu Albahar Recruitment (June 26th, 2009)
- Oil & Gas Job Vacancy Doha – Mechanical Engineer (Static), Process Engineer, Loss Prevention Engineer, Contracts Engineer, Telecoms Specialist via NES Global (June 15th, 2009)














piping supervisor